Structure Cabling System: The U.S. Lucent SYSTIMAX SCS structure cabling solution adopts Cat 5 Twist Pair and the system can support more than 100Mbps network and 155MbpsATM equipment. The backbone fiber optic cable in the plaza broke the bandwidth bottleneck.
Central Control System: Provides efficient surveillance and management of the air-conditioning system, fresh air system, cooling water system, water supply and drainage system, lighting system, power system and elevator system, etc.
Water Supply and drainage System: Double-route water supply and 24 hours hot and cold water supply. 24 hours cooling water system meets the need for specialized machine room cooling.
Security System: The plaza equipped with security monitoring system with more than 150 cameras arranged at major entrances and exits, elevator halls, parking area and lobby, etc., which automatically records the report all the time.
Fire Control System: The Japanese NOMEI intelligent fire automatic alarm system provides automatic fault testing, alarm and spray. The most advanced intelligent automatic fire detection, alarm system and smoke alarm system adopt the photoelectric sensors. Allocating the temperature and hazardous gas detectors in different function sections, the system works 24 hours a day. Once the unwanted fire occurs, the fire sprinkler system, fire alarm system and smoke evacuation system will work automatically. At the same time, some other relevant systems in the plaza will also begin to fight the fire together.
Parking Management System: To ensure enough parking lots, the plaza provides parking area both above the ground and underground. The B2 floor reserved two-storey parking space is equipped with intelligent management system.
 